Icons, rectangular, neutral, white
Merten 395500Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For rocker switches and toggle switches with a rectangular cut-out. Neutral, white finish.
Merten 395500
395500
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Blind cover, polar white, System M
Merten 391819Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
Covers for relays, multi-function roller shutter control relays, buzzers, power modules, KNX flush-mounted devices, etc. Suitable for universal use following mechanical machining (drilling, milling, etc.). Without clips, for screw fixing....
Merten 391819
391819
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Centre plate for British Standard so
Merten MTN2120-0319Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
To be completed with MTN2120-0000 British Standard socket insert, 13A, AC 250 V, 2-pole + E. The protection rating is IP20. Material: glossy thermoplastic....
Merten MTN2120-0319
MTN2120-0319
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
AQUADESIGN frame, single, anthracite
Merten 400114Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
AQUADESIGN frame, single, anthracite. Colour: anthracite.
Merten 400114
400114
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Central plate for roller shutter pus
Merten 319419Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For standardised profile half-cylinder locks with a length of 40 mm. To be completed with a roller shutter push-button latch switch insert for lock cylinder 318501. Roller shutter push-button insert for lock cylinder 318901. Material: thermoplastic...
Merten 319419
319419
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
M-SMART frame, 4-panel with label ho
Merten 470419Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For the clear identification of inserts. When the frame and central plate are removed, the label holder remains on the insert. This ensures that...
Merten 470419
470419
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
M-PLAN real glass frame, triple-glaz
Merten 489319Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For vertical and horizontal installation. Material: glass. Colour: brilliant white.
Merten 489319
489319
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
M-PLAN real glass frame, 4-panel, on
Merten 489403Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For vertical and horizontal installation. Material: glass. Colour: onyx black.
Merten 489403
489403
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
SCHUKO socket with hinged cover, ind
Merten MEG2313-0319Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
Integrated enhanced protection against electric shock in accordance with VDE 0620 Part 1. The green LED lights up when mains voltage is applied. Features: Front-panel retrofitting of QuickFlex add-on modules without...
Merten MEG2313-0319
MEG2313-0319
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Socket with earth pin, touch protect
Merten MEG2500-0319Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
Integrated enhanced protection against accidental contact in accordance with VDE 0620 Part 1. Features: Front-panel retrofitting of QuickFlex add-on modules without removing the socket. Quick-thread screws for securing the clamps....
Merten MEG2500-0319
MEG2500-0319
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Toggle switch for emergency heating
Merten MEG3327-0460Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For use with control switches and push-buttons. With red viewing window and ‘Heating emergency switch’ label. To be completed with a single-gang switch and push-button. Material: thermoplastic...
Merten MEG3327-0460
MEG3327-0460
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
D-Life stone frame, double, polished
Merten MEG4020-6547Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For vertical and horizontal installation. Material: stone. Colour: honed slate.
Merten MEG4020-6547
MEG4020-6547
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Toggle switch with inspection window
Merten MEG3322-6050Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
Toggle switch with inspection window and ‘Light’ marking, for use with control switches and push-buttons. Nickel metallic, System Design.
Merten MEG3322-6050
MEG3322-6050
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Connected wireless push-button switc
Merten MEG5001-0300Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
Wiser wireless push-buttons with 2 or 4 switching points trigger events or control wireless connected actuators in a Wiser home automation system (Zigbee). Freely positionable...
Merten MEG5001-0300
MEG5001-0300
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Connected push-button module, 2-gang
Merten MEG5126-0300Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
Wiser push-button module for local control of PlusLink electronic modules and smart integration with a Wiser home automation system (Zigbee). Smart Home-ready for a Wiser Home system...
Merten MEG5126-0300
MEG5126-0300
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Rocker switches for 2-gang push-butt
Merten MEG5220-0403Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For System M. The rockers are plugged onto the 2-gang push-button module. To be completed with a Wiser 2-gang push-button module, System M MEG5123-03xx...
Merten MEG5220-0403
MEG5220-0403
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Mounting bracket for ARGUS 220-360,
Merten CCT566119Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
Mounting bracket for fixing the ARGUS 220-360 to external or internal corners. Can also be fitted to fixed pipes (VDE 0100) using standard pipe clamps...
Merten CCT566119
CCT566119
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Seesaw, anthracite, AQUADESIGN
Merten 343114Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For use with two-way switches, cross switches and push-buttons. To be fitted with a single-gang switch or push-button. Supplied with rocker switch and spacer plate. Colour: anthracite.
Merten 343114
343114
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Rocker switch for series switches, p
Merten 343519Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For use with series switches, double-throw switches and double push-buttons. To be fitted with a switch and push-button, double. Supplied with rocker switch and spacer plate. Colour: polar white.
Merten 343519
343519
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Rocker switch for series switches, p
Merten 434519Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For use in series circuits, double-throw switches and double push-buttons. To be completed with a switch and push-button, double. Material: thermoset, highly scratch-resistant. Colour: polar white.
Merten 434519
434519
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Centre plate for XLR audio connector
Merten 468019Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For audio connectors: XLR circular connectors manufactured by Binder, Cannon, Neutrik (P-flange socket) or similar. Material: glossy thermoplastic. Colour: glossy polar white.
Merten 468019
468019
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Support frame with central plate for
Merten 290319Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
Also suitable for control and signalling devices with single-hole mounting, 16 mm diameter (e.g. Lumitas). Second opening can be broken out. Material: glossy thermoplastic....
Merten 290319
290319
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Rocker switch IP44, glossy active wh
Merten 432025Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For use with two-way switches, cross switches and push-buttons. Protection class IP 44: splash-proof. To be fitted with a single-gang switch or push-button. Contents: rocker switch with seal kit,...
Merten 432025
432025
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Shaver socket insert
Merten 213300Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For international 2-pin plug systems (Euro plug, US standard, Australian/Chinese standard). The secondary voltages can be tapped directly in two plug positions. With screw terminals up to 2.5...
Merten 213300
213300
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Roller shutter switch insert for loc
Merten 318860Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
For standardised profile half-cylinder locks with a length of 40 mm. Accessories: profile half-cylinder with key extraction in the centre position MEG3985-0001. Profile half-cylinder with key extraction in 3 positions...
Merten 318860
318860
Delivery time:
1-3 Tage
Delivery time:
5-14 Tage
incl. 19% VAT
Showing 1 to 25 of 1968 results